As Per Ayman Botros:
" We have 6 picnic tables to be installed in the pavilion.
We also have 4 park benches (8-footers) to be installed along the trail or at any locations selected by the conservancy.
Also, 2 trash receptacles to be installed close to the pavilion."

Parking lot area by the pavilion has been eliminated as agreed on the May 29th site meeting with County Exec, Director of Parks, Director of Public Works and Howard. No vehicles will be allowed passed the bridge as a rustic wooded gate will be installed."